WESTERN TREATMENT PLANT – WERRIBEE
CLIENT:
MELBOURNE WATER
CUSTOMER:
CPBUGL JOINT VENTURE
PROJECT VALUE:
$3.6 MILLION
WHAT WE DID:
- 8x Blowers
- Dn1400 Stainless steel Aeration header
- Dn500 Stainless Steel Aeration distribution piping
- 4 x 88m Bioreactor/ Clarifier tanks including
- 45m Spiral blade Clarifier
- Clean water Launders
- Bridge mounted Vertical Anoxic mixers
- Diffused Air Membranes 1056 Hydroflux Aerostrip Q4 Diffusers per tank
- Inlet feed and Ras Pumping stations
SHAKESPEARE GROVE ST KILDA MELBOURNE
CLIENT:
MELBOURNE WATER
CUSTOMER:
JOHN HOLLAND & KBR
PROJECT VALUE:
$800K
WHAT WE DID:
- Supply Manufacture and install a Structural Platform
- Supply and Install Custom Polished Stainless steel Balustrade
- Coordination of Oversize transportation between QSW Manufacturing facility and St Kilda Beach
- Project Management of QSW Site labour, Subcontractors Plant and equipment
GALONG LIMESTONE STORAGE UPGRADE
CLIENT:
GRAYMONT
PROJECT VALUE:
$800K
WHAT WE DID:
- Decommission load out plant from beechworth
- Complete modifications to structural steel
- Complete silo refurbishment
- Transport to Galong
- Co-ordination of Oversize transport
- Install new silo configuration
O’SHANNASSY RESERVOIR
CLIENT:
JOHN HOLLAND KBR JV
PROJECT VALUE:
$1.5 MILLION
WHAT WE DID:
- Design, Fabrication and Installation of Dn1200 MSCL Fittings for mini Hydro power station
- Plan and develop procedures for removal and replacement of Valves contained within outlet tunnel
- Installation of inlet screen, Dn2100 MSCL pipeline.
- Fit out of intake shaft
- Installation of Dn1600 Outlet pipe and valve chamber
Trust and Worth
Our Clients
![1-Westerport_water](https://qualitysitewelding.com.au/wp-content/uploads/2023/03/1-Westerport_water.jpg)
![3-CPB-Logo](https://qualitysitewelding.com.au/wp-content/uploads/2023/03/3-CPB-Logo.jpg)
![wood-v2](https://qualitysitewelding.com.au/wp-content/uploads/2023/03/wood-v2-1.jpg)
![5-John_Holland](https://qualitysitewelding.com.au/wp-content/uploads/2023/03/5-John_Holland.jpg)
![6-xylem](https://qualitysitewelding.com.au/wp-content/uploads/2023/03/6-xylem.jpg)
![7-FH-Logo](https://qualitysitewelding.com.au/wp-content/uploads/2023/03/7-FH-Logo.jpg)
![8-Gippsland_water](https://qualitysitewelding.com.au/wp-content/uploads/2023/03/8-Gippsland_water.jpg)
![9-gvw](https://qualitysitewelding.com.au/wp-content/uploads/2023/03/9-gvw.jpg)
![10-KSB](https://qualitysitewelding.com.au/wp-content/uploads/2023/03/10-KSB.jpg)
![11-downergroup](https://qualitysitewelding.com.au/wp-content/uploads/2023/03/11-downergroup.jpg)
![12-Lower-Murray-Water](https://qualitysitewelding.com.au/wp-content/uploads/2023/03/12-Lower-Murray-Water.jpg)
![13-pq-Austrlaia-02](https://qualitysitewelding.com.au/wp-content/uploads/2023/03/13-pq-Austrlaia-02.jpg)
![adra-group](https://qualitysitewelding.com.au/wp-content/uploads/2023/03/adra-group-1.jpg)
![Graymont](https://qualitysitewelding.com.au/wp-content/uploads/2023/03/Graymont-1.jpg)
![SES](https://qualitysitewelding.com.au/wp-content/uploads/2023/06/SES.jpg)